[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last contents of other sections
..
:: Volume 3, Issue 1 (6-2015) ::
2015, 3(1): 1-14 Back to browse issues page
Delay Ponds as a Solution for Sustainable Urban Development and Management
Soraya Ghasemi , Mahmoud Faghfour Maghrebi *
Ferdowsi University of Mashhad Browse A-Z Advanced Search
Abstract:   (7716 Views)

Abstract

Assessment of flood phenomena and street floods in runoff transmission network basins shows that in some cases rainwater transmission channels cannot transmit current flow after a while - especially during peak flow- due to an increase in impervious surfaces, particularly owing to some changes in physiographic characters of the basin.. To solve such problems, many research efforts have been undertaken and practical procedures have been implemented. Delay ponds are one of the methods to solve these problems. Other optimal management strategies, BPMs, which can be used depending on the technical and economic conditions in order to solve such problems are biological remain systems, porous coating of streets, vegetative swale, etc. In this paper, a review  of literatures is presented and then our research procedure is presented. Then some issues such as drainage network modeling process in the SWMM software environment are presented. The modeling procedure has been done in Status quo coupled with using delay ponds, in order to find the routes in the network and compare both waterways hydrograph (with and without delay ponds), hydrograph of the individual components in existing networks as well as using the network with delay ponds. It was observed that using delay ponds could be effective especially in limited urban areas. And it can reduce the peak hydrograph flow, increase the peak flood time and as a result, control and optimize management of flood. For this purpose during a two-stage modeling, two and three places were positioned for the construction of flood control basins. It is shown that in case of using two and three basins, the peak discharge were is reduced by 31% and 38%, respectively.

Keywords: Optimal management strategy BPMs, Rainfall-run off dynamic simulation, Delay ponds, SWMM model
Full-Text [PDF 1495 kb]   (127 Downloads)    
Type of Study: Research | Subject: Special
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

ghasemi S, Faghfour Maghrebi M. Delay Ponds as a Solution for Sustainable Urban Development and Management. Journal of Rainwater Catchment Systems 2015; 3 (1) :1-14
URL: http://jircsa.ir/article-1-107-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 3, Issue 1 (6-2015) Back to browse issues page
مجله علمی سامانه های سطوح آبگیر باران Iranian Journal of Rainwater Catchment Systems
تکمیل و ارسال فرم تعارض منافع
نویسنده گرامی ، پس از ارسال مقاله ، جهت دریافت فرم، لطفا بر روی کلمه فرم تعارض منافع کلیک نمایید و پس از تکمیل، در فایل های پیوست مقاله قرار دهید.
Persian site map - English site map - Created in 0.05 seconds with 37 queries by YEKTAWEB 4660