[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last contents of other sections
..
:: Volume 12, Issue 4 (12-2024) ::
2024, 12(4): 123-125 Back to browse issues page
Locating and prioritizing areas susceptible to underground dam construction within the Fashand Watershed in Alborz Province
Alireza Majidi *
Assistant Professor, Department of Hydrology and Water Resources Development, Soil Conservation and Watershed Management Research Institute, Agricultural Research, Education and Extension Organization, Tehran, Iran. Email: majidi_geo@yahoo.com & Agricultural Research, Education and Extension Organization
Abstract:   (424 Views)
The strong capacity of Geographic Information System (GIS) in spatial data analysis, especially the integration of information layers, helps in selecting the optimal location for an underground dam, considering time and cost savings. Multi-criteria analysis (MCA) is a Geographic Information System (GIS)-based decision-making technique designed based on various criteria. Multi-criteria analysis (MCA) is used to identify the most suitable locations for constructing structures or implementing construction projects, especially at regional and sub-regional scales. Multi-criteria analysis, integrated with GIS, combines various criteria/parameters into a single result and location.The main objective of this paper is to find a practical and applicable method in locations similar to this project by making decisions on the dam's location. The use of GIS and RS techniques was employed to create a weighting model, compare, and prioritize suitable areas for underground dam construction using information and decision support systems. The main socio-economic criteria, water runoff, and water quality and quantity were utilized to determine the dam's location. The results indicated that the southern regions have a high priority for underground dam construction. Based on the ranking of the disaggregated maps, the final range varies between 4.7 and 8.19. Despite the high EC rate and lower permeability class, these areas achieved better results in the final weighting due to shorter distances from settlements, better land use/cover classes, and greater socio-economic impact.
Article number: 8
Keywords: Underground dam, analytical hierarchy process, GIS, RS, Fashand
Full-Text [PDF 3110 kb]   (113 Downloads)    
Type of Study: Research | Subject: Special
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Majidi A. Locating and prioritizing areas susceptible to underground dam construction within the Fashand Watershed in Alborz Province. Journal of Rainwater Catchment Systems 2024; 12 (4) : 8
URL: http://jircsa.ir/article-1-578-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 12, Issue 4 (12-2024) Back to browse issues page
مجله علمی سامانه های سطوح آبگیر باران Iranian Journal of Rainwater Catchment Systems
تکمیل و ارسال فرم تعارض منافع
نویسنده گرامی ، پس از ارسال مقاله ، جهت دریافت فرم، لطفا بر روی کلمه فرم تعارض منافع کلیک نمایید و پس از تکمیل، در فایل های پیوست مقاله قرار دهید.
Persian site map - English site map - Created in 0.06 seconds with 37 queries by YEKTAWEB 4710