[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Last contents of other sections
..
:: Volume 11, Issue 2 (8-2023) ::
2023, 11(2): 1-16 Back to browse issues page
Evaluation of the use of ponds in the surface runoff collection network by simulation method (Case Study: Mashhad East Eghbal Floodway)
Mahdi Amini Yazdi , Mahmoud Faghfour Maghrebi *
Professor, Civil Engineering Department, Faculty of Engineering, Ferdowsi University of Mashhad, Mashhad, Iran, Email: maghrebi@um.ac.ir
Abstract:   (969 Views)
Uncontrolled floods always cause extensive financial and human losses in cities. Flood control is one of the most important goals of urban management. In this regard, an attempt has been made to investigate the effect of delayed ponds on the flood control of the Eghbal Floodway located east of Mashhad. East Eghbal Floodway, with a sub-catchment of about 13850 ha, is one of the most significant floodways of the developing Mashhad metropolis, including eight major floodways and 213 sub-catchments with many urban facilities. To evaluate and simulate the flood path, the precipitation pattern was calculated using different methods, including the concentration time of each sub-catchment. The most extended length of the stream, the uniform distribution of catchment sensitivity, periodic block, and peak flood flow caused by critical rainfall with a 50-year return period were calculated at the outlet. Finally, according to the topography of the area and available places using two, three, and four detention ponds to consider 11 different scenarios (economic-hydraulic), the peak flow of the flood decreased, and the time of peak flow increased. By evaluating and comparing different scenarios, scenario number 11 (using four detention ponds reduces the peak flood discharge by 48%) was the best hydraulic scenario. In addition, scenario number 4 (using two detention ponds reduces peak discharge by 24%) was the best economic scenario. A dry trapezoidal catchment within the network with two outlets, a lower opening, and a rectangular overflow was modeled in SWMM5.0. Geographic Information System (GIS) and SWMM5.0 rainfall–runoff simulation have been used to determine the physical component of sub-catchments.
Article number: 1
Keywords: Detention pond, GIS, Mashhad East Eghbal Floodway, Precipitation pattern, SWMM5.0
Full-Text [PDF 2289 kb]   (331 Downloads)    
Type of Study: Research | Subject: Special
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Amini Yazdi M, Faghfour Maghrebi M. Evaluation of the use of ponds in the surface runoff collection network by simulation method (Case Study: Mashhad East Eghbal Floodway). Journal of Rainwater Catchment Systems 2023; 11 (2) : 1
URL: http://jircsa.ir/article-1-454-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 11, Issue 2 (8-2023) Back to browse issues page
مجله علمی سامانه های سطوح آبگیر باران Iranian Journal of Rainwater Catchment Systems
تکمیل و ارسال فرم تعارض منافع
نویسنده گرامی ، پس از ارسال مقاله ، جهت دریافت فرم، لطفا بر روی کلمه فرم تعارض منافع کلیک نمایید و پس از تکمیل، در فایل های پیوست مقاله قرار دهید.
Persian site map - English site map - Created in 0.05 seconds with 37 queries by YEKTAWEB 4645